• CONTROLS

    • Cad Cell Relay (Heating Only) (Note: A/C Ready Kit NOT Covered)
    • Barometric Draft Regulator
    • Circulator Control
    • Emergency Switch (Not Wiring)
    • Single-Acting Aquastat
    • Thermostat (Manual Heat Only)
  • BURNER REPLACEMENT PARTS

    • Burner Blast Tube (Std. Size)
    • Burner Flange Gasket
    • Cad Cell Assembly
    • Delayed oil Valve Coil
    • Electrode Assembly
    • Nozzle Adapter
    • Burner Coupling
    • Burner Motor
    • Cad Cell Eye
    • Delayed Solenoid
    • End Cone (Std-No Special Order)
    • Ignition Wiring
    • Nozzle Line
    • Burner Fan
    • Buss Bar Transformer Leads
    • Delayed Oil Valve
    • Electrodes
    • Nozzle
  • FUEL SUPPLY PARTS

    • Flare Fittings at Fuel Pump
    • Fuel Filter Complete
    • Flare Fitting at Fuel Filter
    • Fuel Pump
    • Fuel Pump Strainer
    • Fuel Filter Cartridge
    • Fuel Pump Bleeder
    • In-line Oil Valve
  • WARM AIR FURNACE SYSTEM PARTS

    • Air Diffuser (Limit 1)
    • Blower Motor – 1/3 hp
    • Blower Motor – 1/4 hp
    • Blower Wheel
    • Fan Limit Switch
    • Blower Pulley
    • Fan Relay
    • Std 1″Disp. Air Filter (Limit 2)
    • *Electronic Control Boards NOT Covered
    • *ECM, Constant Torque Belt-Drive Motors NOT Covered
  • SERVICES

    • Bleeding of Radiators (Where Accessible),(1 Hour Maximum in Plan Year)
    • Purging of heating system (1 Hour Maximum in Plan Year)
    • Adjust Boiler Pressure
  • ANNUAL TUNE-UP

    The Annual Tune-Up is included in all of our Plans and will be performed once during the service agreement term during normal working hours as scheduled by our office. The Annual Tune-Up includes:

    • Test and adjust oil burner for maximum efficiency.
    • Visual inspect of combustion chamber, as accessible.
    • Clean & check electrodes ad nozzle assembly.
    • Replace Air Filter (Std. 1″ Disposable Series Only), if necessary.
    • Replace Oil Filter Cartridge, if necessary.
    • Replace Burner Nozzle, if necessary.
    • Oil Motors on burner, fans circulators.
    • Check safety & operating controls.
    • Check oil tank & lines for visible leaks.
    • Vacuum furnace, flue-pipe if necessary.
    • Vacuum chimney base if necessary & accessible.
  • HOT WATER BOILER SYSTEM PARTS

    • Air Vent/Hi Vent (Limit 1)
    • Blow Down Valves
    • Circulator Impeller
    • Circulator Switch
    • Combustion Chamber (If Accessible)
    • Extrol Tank
    • Flow Valve
    • Mixing Valve (Limit 1)
    • Taco Zone Valves (Limit 1)
    • Taco Powerhead (Limit 1)
    • Zone Valve Motor (Limit 1)
    • Boiler Valves (Limit 2)
    • Circulator Motor (Limit 1)
    • Circulator Wicking
    • Complete Taco Circulator (Limit 1)
    • Feed Valve
    • Low Water Cut off
    • Pressuretrol
    • Relief Valve (Limit 1)
    • Transformer – Low Voltage
    • Zone Valve Relay (Limit 1)
    • Bearing Assembly (Limit 1)
    • Circulator Coupling
    • Circulator Motor Mounts
    • Combination Control
    • Expansion Tank
    • Fitrol Tank
    • Mixing Valve Element (Limit 1)
    • Purge Valve at Boiler (Replace Only)
    • Solenoid Valve
    • Triple-Acting Aquastat
    • Zone Valve Stem (Limit 1)
    • Pressure Temperature Gauge