• CONTROLS

    • Cad Cell Relay (Heating Only) (Note: A/C Ready Kit NOT Covered)
    • Barometric Draft Regulator
    • Circulator Control
    • Emergency Switch (Not Wiring)
    • Single-Acting Aquastat
    • Thermostat (Manual Heat Only)
  • BURNER REPLACEMENT PARTS

    • Burner Blast Tube (Std. Size)
    • Burner Flange Gasket
    • Cad Cell Assembly
    • Delayed oil Valve Coil
    • Electrode Assembly
    • Nozzle Adapter
    • Burner Coupling
    • Burner Motor
    • Cad Cell Eye
    • Delayed Solenoid
    • End Cone (Std-No Special Order)
    • Ignition Wiring
    • Nozzle Line
    • Burner Fan
    • Buss Bar Transformer Leads
    • Delayed Oil Valve
    • Electrodes
    • Nozzle
  • FUEL SUPPLY PARTS

    • Flare Fittings at Fuel Pump
    • Fuel Filter Complete
    • Flare Fitting at Fuel Filter
    • Fuel Pump
    • Fuel Pump Strainer
    • Fuel Filter Cartridge
    • Fuel Pump Bleeder
    • In-line Oil Valve
  • ANNUAL TUNE-UP

    The Annual Tune-Up is included in all of our Plans and will be performed once during the service agreement term during normal working hours as scheduled by our office. The Annual Tune-Up includes:

    • Test and adjust oil burner for maximum efficiency.
    • Visual inspect of combustion chamber, as accessible.
    • Clean & check electrodes ad nozzle assembly.
    • Replace Air Filter (Std. 1″ Disposable Series Only), if necessary.
    • Replace Oil Filter Cartridge, if necessary.
    • Replace Burner Nozzle, if necessary.
    • Oil Motors on burner, fans circulators.
    • Check safety & operating controls.
    • Check oil tank & lines for visible leaks.
    • Vacuum furnace, flue-pipe if necessary.
    • Vacuum chimney base if necessary & accessible.